FORM C.R.E. No. 24, Kowloon Canton Railway. BRITISH SECTION. ESTIMATE.
Main Head .... Bridges,
Sub. Head Work Major Bridge No.17. Three 20' Arches at chain 40°.730
Drawing C.R.E.No. 362
DESCRIPTION Quantity Rate Unit AMOUNT Excavation in founds. 21,900 10-% ort 219.00 Timbering and pumping 1,100 Concrete in founds 1,000 8 35/- fort 4,900 Masonry in coping 350 Masonry in superstructure 18,600 40/- % oft 7,440.00 Masonry in arches. 2/m 0.ft. 2,485 9,800.00 Dry stone backing. 700 2/- 0.1t. 3,550 10/- % oft Total 21,679 Contingincies 10% 2,167.95 Grand Total 23,847.45Page 89
KI letoT
201 zsionigniino)
leloT bræD
88
.CBWlisЯt notneD noolwo
.I
KOITD32
HRITIME
.37AMIT23
I.
LI;:O!
£.
.0:
I
{
Q
.00
I
.00
I
14
A I
400
Zoitti DA40
.&
܃
A
FORM C.R E. No. 24,
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
5.
89
}
bash nisl.
best dus
Main Head ....
Bridges,
Sub. Head
Work
Major Bridge No.17.
Three 20' Arches at chain 40°.730
31.
Drawing C.R.E.No. 362
AMOUNT.
Quantity.
DESCRIPTION,
Rate. Unit.
الكردية
Cts.
21,900 Excavation in founds.
10- % ort
219 00
,100
Item Timbering and pumping
Concrete in founds
1,000 | 00
8
35/- fort
"
4,900
350 Masonry in coping
18,600 Masonry in superstructure
Masonry in arches.
40/- % oft
2/m 0.ft.
2,485 7,440 00
9,800 00
| 00
2/- 0.1t.
700
3,550 Dry stone backing.
10/- % oft
མ
38
8 8 8 8
50
1
10
Total
Contingincies 10%
21,679
2,167 95
23,847 45
50
KI
letoT
201 zsionigniino)
leloT bræD
Grand Total